Skip to content
Epic Edge Gulf Coast Construction Management
Construction manager in orange safety vest reviewing project data on a rugged tablet at an active federal facility construction siteReality capture technician operating a tripod-mounted survey-grade laser scanner inside a large building interiorCrew installing an electric vehicle charging station at dusk under portable work lights
Service-Disabled Veteran-Owned · Gulf Coast

Construction at the speed of the modern age.

Twelve capability lanes under one prime — federal, commercial, residential, and rural. In-house reality capture and a bench of specialists that deploys where the work is.

Who we are

Federal construction management, built on modern infrastructure.

Epic Edge Gulf Coast is a Texas-based SDVOSB construction management firm. We scope, scan, build, and certify federal projects without handing a single phase to a competitor — because we own the technology that most firms subcontract.

  • SDVOSB set-aside eligible — SAM.gov registered, SBA VetCert path
  • In-house LiDAR, GPR, and Part 107 drone fleet — no scanning subs
  • Proprietary operations platform — immutable compliance audit trail
  • Twelve capability lanes deployed from one prime contract
Survey-grade laser scanner mounted on a tripod inside a wide industrial buildingConstruction foreman in a hard hat reviewing project drawings on a Gulf Coast job site
9Capability Lanes
Gloved hands holding a rugged tablet showing a construction project dashboard on an active job site
The platform

Every project runs on our own operating system.

The Epic Edge platform is not a subscription we rent. It is proprietary infrastructure — bid pipeline, multi-project health, compliance engine, and role-secured portals for clients, subs, and suppliers. Ten role tiers. Row-level security on every table. An audit log that only appends.

  • Contracting officers see status without an email chain
  • Compliance items surface before they go red, not after
  • Every action timestamped, attributed, and exportable for audit
Projects

Explore recent projects

Case studies publish as awards close out and agency clearance is confirmed. Current pursuits include municipal sidewalk and ITS infrastructure, federal facility documentation, and EV charging deployment.

How we work

Scan. Build. Certify.

Three phases, one team, no handoffs. The documentation that starts the project is the same documentation that closes it out.

S
1

Scan

Survey-grade LiDAR, GPR, and drone capture before a single crew mobilizes. 50,000 sq ft documented in under six hours, accurate to 1.9mm.

B
2

Build

Prime construction management across twelve lanes. Specialists deploy from the bench — licensed, insured, and verified before they reach the site.

C
3

Certify

Davis-Bacon payroll, Buy American thresholds, EM 385-1-1 safety, and CMMC posture tracked continuously — not reconstructed at closeout.

What we do

Twelve capability lanes

Each lane is a complete specialty practice. Together they let one prime scope, scan, build, and close out federal, commercial, residential, and rural work end to end.

Technician scanning a large building interior with a tripod-mounted LiDAR scanner

Reality Capture & Scanning

Survey-grade LiDAR, photogrammetry, GPR, and drone capture. Digital twins and BIM-ready as-builts, in-house.

Read more
Site managers reviewing construction plans at a job site trailer

Prime Construction Management

Preconstruction, estimating, scheduling, sub coordination, quality, and closeout on federal and commercial work.

Read more
Electrician working inside an open industrial electrical panel

Electrical & EV Infrastructure

Federal facility electrical, NEVI charging deployment, three-phase commercial. Licensed master electricians.

Read more
Overhead red fire sprinkler piping in a commercial building ceiling

Fire Protection Systems

Suppression design, installation, testing, and inspection. NICET III/IV, mission-critical experience.

Read more
Technician in a safety harness working high on a steel communications tower

Broadband & Tower Infrastructure

Rural broadband, tower construction, fiber and last-mile. BEAD, ReConnect, Connect America.

Read more
Concrete pour in progress with concrete cylinder test samples in the foreground

Advanced Building Materials

Carbon-negative materials, TAA-compliant sourcing, Buy American threshold compliance.

Read more
Crew finishing new concrete sidewalk and curb work along a city street

Civil & Site Infrastructure

Sitework, paving, sidewalk and ADA improvements, drainage, and ITS/signal infrastructure.

Read more
Rooftop mechanical HVAC units being installed on a commercial building

Mechanical, HVAC & Plumbing

Federal facility mechanical systems, controls, and plumbing scopes on renovation and new construction.

Read more
Technician terminating low-voltage cabling at a security equipment rack

Security & Access Control

Low-voltage, access control, and surveillance systems for federal facilities and secure environments.

Read more
Crew installing exterior sheathing on a framed two-story house under construction

Residential Construction

Custom homes, production runs, multi-family, and storm reconstruction built with commercial-grade controls.

Read more
Excavator trenching a utility line across open ranch land toward a metal outbuilding

Rural Development

Rural site work, access roads, on-site water and septic, and utility extension past the service line.

Read more
Mid-rise commercial building shell under construction with a tower crane overhead

Commercial Construction

Ground-up shell and core, tenant finish-out, and occupied renovation under our own construction contract.

Read more

Systems we specify and install

Sol-Ark
EcoFlow
L-Charge
Real Power
Portable Electric
EVESCO
Power Solutions

Power that shows up where the grid doesn't.

Four families of equipment, each built for a job the others can't do. We size the system, handle the interconnection, and stand behind the install.

Request a power assessment

Mobile & Off-Grid Power

Silent battery power for occupied buildings and night work. Truck-integrated generation for crews who already run diesel.

  • No permit, no interconnection, no wait
  • Runs where a generator is too loud or too dirty
  • Rental, purchase, or fleet integration
See mobile options
Trailer-mounted power unit parked on a night jobsite under work lights with cables running to a building under constructionZero emission

Towable Battery Power Station

Portable Electric

Diesel-generator replacement for jobsites, events, and occupied facilities. Silent, no exhaust, no fuel handling.

Continuous output
27 kW
Storage
80 kWh LFP
Output
120/208V 3-phase
Specs
White utility service truck parked at a work site with cable reels deployed from a below-deck compartmentTruck-integrated

Truck-Mounted AC Generator

Real Power

Mounts below deck and runs off the truck's own engine. No genset in the bed, no separate fuel system to maintain.

Output range
12 kW – 180 kVA
Voltage
480V · 208V · 240V
Bed space used
None
Specs
Worker in a hard hat carrying a compact portable power box toward a jobsite trailerPlug-in

Portable Power Stations

EcoFlow

Plug-in backup for tools, trailers, and essential circuits. No electrician and no permit to get running.

Install
None required
Capacity
Expandable
Recharge
Grid, solar, vehicle
Specs

Every system is sized after a site evaluation. Tell us the load, the location, and the constraint, and we'll come back with a specification.

In the field

Six situations, six different answers.

Dim hospital corridor under renovation at night with temporary string lighting, plastic containment sheeting over doorways, and cable runs across the protected floor
Mobile & Off-Grid

Renovation in an occupied hospital wing

Night electrical work in a wing that couldn't be shut down. Battery power ran the crew with no exhaust and no generator noise carrying into patient rooms.

See the equipment
Quick quote

Start a bid request in four minutes.

Federal solicitation, municipal project, commercial build, residential job, or a teaming request as a prime. Six steps, and your project lands in our pipeline with the scope already captured.

  • Routed to the owner, not a general inbox
  • Go/no-go scored against our capability lanes
  • Registers your organization in our network
  • Questions tailored to your project type
24 hrs
Response commitment

What kind of client are you?

Step 1 of 6
Compliance engine

Audit-ready is a system, not a scramble.

Federal contracting is a compliance sport. The firms that win consistently are not always the most technically capable — they are the most reliably compliant. We build compliance into infrastructure.

  • CMMC posture and SPRS score tracked to next review date
  • EM 385-1-1 pre-task plans and activity hazard analyses on file
  • Davis-Bacon certified payroll generated weekly, not monthly
  • Buy American and TAA content thresholds calculated per project
  • OSHA heat-stress, WBGT, and incident logs generated from the field
Hand marking up federal construction drawings with a fine-tip pen during compliance review
0Capability lanes
0.0mmScan accuracy
0KSq ft in 6 hours
0%Veteran-owned
Our team

Key personnel

FAR 15.305 framing — named personnel, credentials, and relevant federal experience.

Portrait of Philip Dawson, President and Founder of Epic Edge Gulf Coast

President & Founder

Philip Dawson

Portrait of Carey Mills, Lead Estimator at Epic Edge Gulf Coast

Lead Estimator

Carey Mills

Project Manager

[Name pending]

Safety Director

[Name pending]

In their words

What partners will say.

[Placeholder — CO quote pending award closeout and agency public-release clearance. Do not publish until approved.]
[Name pending]Contracting Officer
[Placeholder — commercial client quote pending first completed engagement.]
[Name pending]Commercial Client

Target agencies — pursuit focus, not a client list

  • VA
  • USACE
  • USDA RD
  • GSA
  • DoD
  • Bureau of Rec
Insights

The Edge Brief

Construction tech, veteran affairs, federal contracting, and field notes from the work. Read it. Use it.

American flag beside the steps of a federal government building

Federal Contracting

SBA VetCert is now the only path — what changed for SDVOSBs

Read more
Laptop displaying a 3D point-cloud scan of a building interior beside a laser scanner

Construction Tech

What 1.9mm accuracy actually buys you on a renovation

Read more
Utility poles and staged conduit materials in a construction laydown yard at golden hour

Field Notes

Procurement is the critical path. Plan the poles first.

Read more
Capability briefing

Tell us what the project needs.

Send scope, timeline, and agency. We respond within 24 hours with a capability statement and a direct line to the owner.

Newsletter

The Edge Brief

Federal construction intel, solicitation notes, and field technology — monthly.